This is our last video update before the final reveal! It’s been 6 months since we started this massive project in Azle, and we are down to the finishing touches.
The exterior is finished and painted. The concrete floors downstairs are prepped for tile, and our crews will install the flooring very soon. Our clients chose a wood-look tile for most of the downstairs areas, and carpet and LVP for the upstairs, which is already installed.
The primary bathroom and closet are mostly done. The beautiful dark ready-made cabinets and countertops have been installed, and the shower is tiled.  The fixtures and pulls are all that’s left to finish those spaces!
Our custom cabinet maker built cabinets for the more complicated spaces throughout the home. There is a custom drop-off area and storage space under the stairs. The queen-size beds with twin-size trundles have been installed upstairs in the bunk room, along with shelving for each nook. There are also custom shelving units in the homeowner’s office.
The homeowner opted for a Dutch door in his office to add something fun and unique. Decking has been installed on the balcony, with railing going in later this week. The view is beautiful!